Production process of hot tub
THERMOFORMING PROCESS
Acrylic Shell forming workshop has equipped with automatic digital molding machine, infrared continuous temperature measurement, accurate measurement of temperature and water vapor, uniform heating, fast speed, molding temperature can be adjusted according to the climate change, to ensure the molding temperature cylinder quality and energy saving.
SHELL REINFORCEMENT
Reinforcement workshop continuously optimizes the process standards and operating procedures, equiped multiple intelligent robotic arms, using the production procedures with the optimal process, with the lowest cost, and the optimal energy saving and emission reduction through multi-probe, multi-sensing, the whole process of automatic control operation and production.
MANUAL CUTTING/POLISHING
Professional drilling by experieced woker can make sure 100% accurate
ACCESSORY ASSEMBLY
Assembling workshop, with six assembly lines,all materials used for assembly are raw materials that meet environmental protection requirements and product safety, energy saving.
HYDRAULIC/ELECTRIC TEST
Testing workshop, two water testing areas,the completed bathtubs will be sent to the testing workshop to test the water, observe the water temperature of the product, the arc of the spray nozzle, etc.
CABINET ASSEMBLY
Cabinet assembly workshop is an important job in assembling the skirt, the assembled bathtub will undergo the final step of cleaning, packaging
PACKING
Strict and careful packaging makes the product more space-saving and less likely to damage the goods.The shipping time is about 15-30 days, and the goods will be delivered to the customer as quickly as possible

 
            








